Thursday, October 24, 2013

Plumbing Rough-In Starts

This turned out to be such a long process and grateful to John for figuring out all the runs and connection points.  Sammy (retired master plumber) also came out and provided guidance during the process.

In the 4'+ crawl space looking at the 3" line


Vents and drains in place for kids bathrooms.



No comments:

Post a Comment