Tuesday, July 23, 2013

Main Floor Framing

Framing upstairs has started so we no longer have a wide open dance floor with no rails.  The perimeter walls were framed and sheeted which really made it take shape.


Started laying down the drainage pipe that will actually be underneath the front porch.  I seriously doubt water will ever make it that far as the porch is covered and I will have a french drain right in front of the porch as well - I don't want any water making it's way toward the basement even though the drainage out there is amazing.



I installed the sonotubes on top of the 24" pier pads for the front deck support.

I started putting the Delta Drain against the foundation before I backfilled.

Looking at the dining room



Breakfast nook with windows completely surrounding.  Can't wait to eat breakfast and just see nature all around us.

Starting to frame in the dining room

Pit for the alligators when the kids are being not no nice.


After a week, the garage was finished and the interior walls were completed.